Download | - View final version: Construction of a water storage dam on permafrost: discharge and blocking up the river during construction of the Uilyui Hydro-Electric Power Station (PDF, 2.0 MiB)
|
---|
DOI | Resolve DOI: https://doi.org/10.4224/20375843 |
---|
Author | Search for: Biyanov, G. F.; Search for: National Research Council of Canada. Division of Building Research |
---|
Format | Text, Technical Report |
---|
Physical description | 30 p. |
---|
Subject | permafrost; soils; dams; civil engineering; water flow control works; hydroelectric power plants |
---|
Abstract | Two Russian articles dealing with dam construction in northern areas of the U.S.S.R. are included in this publication. The first describes the design and construction of a water storage dam built on permafrost at Mirnyi, in northwest Yakutia. The foundation and core of the dam are maintained in a frozen condition by a duct system through which cold winter air is circulated. The second article describes the construction schedule and placing of materials under severe conditions for a large rock-fill dam associated with a hydro project at Chernishevskii on the Vilyui River in Siberia. |
---|
Publication date | 1969 |
---|
Publisher | National Research Council of Canada |
---|
Series | |
---|
Language | English |
---|
Peer reviewed | No |
---|
NRC number | NRC-IRC-520 |
---|
NPARC number | 20375843 |
---|
Export citation | Export as RIS |
---|
Report a correction | Report a correction (opens in a new tab) |
---|
Record identifier | 13462ea2-e91b-4990-8538-2f606dd04c38 |
---|
Record created | 2012-07-23 |
---|
Record modified | 2023-01-25 |
---|